| Silent Features |
: |
Construction of 4 lane ROB on Vadodara �Surat section of Western Railway on pile foundations with PSC Super
Structure on electrified section. Work includes casting & lowering of PSC girder of 38mtr span on running line on
electrified section. |
| Cost of Project |
: |
Rs.313.00 Lacs |
| Concrete Consumed |
: |
2000 CM |
| Total pushing length |
: |
38 mtr |
| Steel Consumed |
: |
180 M.T. |
| Period of Completion |
: |
12 months including monsoon. |
| HTS Strand with |
: |
40 M.T. |
| Foundations |
: |
1200? piles / 24 Nos |
| Substructure |
: |
RCC pile caps, RCC columns & pier caps |
| Super Structure |
: |
PSC Girders, deck slabs & Parapet. |
| |
|
|
| System of Construction of Super Structure : |
| |
a. Precastings PSC Girders on casting bed erected on steel columns & Trusses kept about 2.5mtr above |
| cap level for Safety of vicinity of H.T. Line |
| b. Prestressing, side shifting & lowering on caps by specially designed equipments. |
| Name of Client |
: |
Surat Virar Station , Near Bhilad Station. |
| |
 |